
Office: 360-874-2311
Fax: 360-874-0287
pioneer [at] pioneerbuildersonline [dot] com
Fax: 360-874-0287
pioneer [at] pioneerbuildersonline [dot] com
Portfolio
Browse some examples of the craftsmanship we put in to each project. Click on the thumbnails to see each gallery and examine our work for yourself.
- Parent Directory
- 20140716-IMG_9111.jpg
- 20140716-IMG_9112.jpg
- 20140804-IMG_9200.jpg
- 20140804-IMG_9201.jpg
- 20140804-IMG_9202.jpg
- 20140917-IMG_2235-2|caption|Just about done with this one. We have our new Under Armour sweatshirts for visibility.jpg
- 20140917-IMG_2238|caption|Installing Ledger Lok screws after joist layout is done. The Milwuakee radio is our constant companion.jpg
- 20140917-IMG_2240.jpg
- 20140917-IMG_2241|caption|Our standard detail now is to picture frame decks. It doesn't take much time and it does make it look a lot better..jpg
- 20140919-IMG_2379-2|caption|Ready to be drywalled.jpg
- 20140919-IMG_2384|caption|Kitchen on the left, nook and living room on the right.jpg
- 20140919-IMG_2389|caption|We built the deck on Wednesday..jpg
- 20140919-IMG_2399|caption|Master bedroom.jpg
- 20140919-IMG_2404.jpg
- 20140919-IMG_2409.jpg
- 20140919-IMG_2414.jpg
- 20140919-IMG_2419.jpg
- 20140919-IMG_2424.jpg
- 20140919-IMG_2439|caption|We left the window out for the drywall to be stocked.jpg
- 20141002-IMG_2693|caption|Went back to hang the window and had a gorgeous sunrise!.jpg
- 20141009-IMG_3558|caption|Came back to form and pour the retaining wall..jpg
- 20141009-IMG_3560|caption|Since I didn't know how long the wall was, I ordered extra #5 bar. We ended up with the verts on 10" centers. Very stout wall. Both the footing and the wall bar was epoxy'd into the existing concrete.jpg
- 20141009-IMG_3563|caption|The "mono" clips we got were missing holes in them to tack to the form. I called the supplier who called the manufacturer and they were a bad batch. We used them anyway, hoping they wouldn't move during the pour..jpg
- 20141009-IMG_3566.jpg
- 20141009-IMG_3572.jpg
- 20141009-IMG_3574|caption|We set up starting at 9, started pouring concrete at 1. I ordered it with calcium in it to speed it up. We stripped about 4 and trowled it smooth.jpg
- 20141009-IMG_3575|caption|My trowel was working well, but Kyle started finishing with his hands (gloved) which roughed it up, so we finished it off that way. Turned out really well. 3 yards total in the footing & walls. 8" thick, 4' high.jpg
- 20141009-IMG_3576.jpg
- 20141009-IMG_3577.jpg
- 20150123-IMG_5849_50_51_52_53.jpg
- 20150123-IMG_5859_60_61_62_63.jpg
- 20150123-IMG_5869_70_71_72_73.jpg
- 20150123-IMG_5874_5_6_7_8.jpg
- 20150123-IMG_5879_80_81_82_83-2.jpg
- 20150123-IMG_5904_5_6_7_8.jpg
- 20150123-IMG_5909_10_11_12_13.jpg
- 20150123-IMG_5924_5_6_7_8.jpg